top of page

Above and Beyond

IBA'27, Kaufland, City of Fellbach
2023

A second layer over retail parking lots: a multi-use platform for climate adaptation.

The installation, built as a 1:1 model in collaboration with Kaufland and local students, demonstrated the potential of canopying a parking lot with a platform that incorporates sustainable solutions for climate adaptation and hosts leisure, urban agriculture, and educational activities. The platform collects rainwater, harvests solar energy, and provides space for growing food, recreation, and commercial use—all while protecting the lower parking level with shade and shelter from rain and snow, and improving the overall experience of visitors.


The Problem

Next to supermarkets and suburban retailers are vast parking lots: empty asphalt surfaces, about twice the size of the shop itself and often much more. Most of these stand empty at least half the time—overcrowded for a few hours on weekends, and completely deserted after opening hours.

Especially in areas where people mainly drive to do their shopping, this asphalted, single-use surface is highly inefficient and reduces the grocery shopping experience to its minimal technical functions: you drive to the supermarket, park the car, walk to the store, return to the car, return the shopping trolley, get back into the car, and drive home.

In summer, these huge asphalt surfaces absorb and radiate heat, while in winter, cars are left unprotected from rain and snow. Parking lots also prevent rainwater from infiltrating the ground, which in turn increases the risk of flooding.

Installation and Vision

The Above and Beyond project reimagines these spaces with a focus on spatial efficiency, introducing a second layer for multi-use activities. This innovative approach blends commercial and recreational functions into one sustainable solution.

What if the parking lot were a place that was not only asphalt, but where tomatoes also grew? Where you could take a break and have a coffee with a friend before driving home? Where children could play and burn off energy before getting back into the car? All these activities are imagined on top of the parking lot, on an additional level that hosts these functions. Separated from the cars below yet designed to foster urban interaction and shared meeting places, this raised layer resists and mitigates not only the environmental cost of traditional parking lots, but also the undesired and outdated separation of functions rooted in earlier modernist logic.

The installation showcases the viability of a sustainability-promoting platform over retail parking lots. It forms part of extensive research into the potential of paved spaces, and retail parking lots in particular. 

Above and Beyond modelled a segment of such a platform in a Kaufland parking lot in Fellbach, designed and built in collaboration with Kaufland and local students during two weekend-long workshops in autumn 2022 as part of IBA27.

bottom of page